Instructure Office Transformation

17,000 square feet rebuilt in 90 days, without moving anyone out

Instructure's seventh floor in Salt Lake City needed more than new finishes. It needed to work differently. Over 90 days the entire floor was demolished, rehabilitated, and reconstructed while the team continued working in the building.

Salt Lake City, Utah Seventh Floor 17,000 Square Feet 90 Days

Project Data

17,000

Square feet

90

Days on site

07

Floor rebuilt

50

Seat employee hub

2

9 by 9 kitchen islands

Location

Salt Lake City, Utah

Scope

Full demolition, rehabilitation, and reconstruction of the seventh floor

Condition

Completed while the tenant occupied the space

Construction Partner

Barr Co

Scope

What We Delivered

A complete rethinking of how the floor performs, not a cosmetic remodel. Every space on the plan was assigned a job before it was assigned a finish.

01

Training Facilities

New rooms built for hands on sessions and team onboarding rather than borrowed conference space.

02

Conference Rooms

Large rooms sized and laid out for real collaboration, with the seating and sightlines to match.

03

Employee Hub

A 50 seat gathering space anchored by two 9 foot by 9 foot kitchen islands.

04

Flexible Meeting Space

Rooms that adapt to the size of the group instead of forcing the group to fit the room.

05

Premium Finishes

Materials selected to hold up daily and framed by panoramic mountain views along the perimeter.

06

Full Floor Rebuild

Complete demolition, rehabilitation, and reconstruction of the entire seventh floor.

Approach

The Value Was in the Planning

The biggest gains on this project did not come from the finishes. They came from the decisions made before anything was built.

The existing layout was challenged rather than accepted. Existing infrastructure was reused wherever it made financial sense to do so. Every trade was coordinated from day one, which is what made a 90 day timeline possible in an occupied building. That approach produced a better workplace without unnecessary cost.

Anyone can build a beautiful office. The advantage comes from building one that makes your people more productive every day.

Execution

Working in an Occupied Space

Renovating around a working team changes everything about sequencing. Noise, dust, access, and safety all have to be planned around the workday instead of the other way around.

Phasing the floor and holding every trade to a coordinated schedule kept the project moving while Instructure kept operating.

01

Demolition

The existing floor was stripped back so the layout could be rebuilt rather than patched.

02

Rehabilitation

Infrastructure worth keeping was identified early and reused where it made financial sense.

03

Reconstruction

Training rooms, conference space, and the employee hub were built out to the new plan.

Gallery

Inside the Space

A look at the finished floor, from the employee hub to the conference rooms.

Construction and development by Barr Co. Congratulations to the Instructure team on this next chapter.

Start Here

Planning a Space of Your Own

Whether you are reworking a single floor or furnishing a full build out, the planning is where the value is created. Tell us what your space needs to do and we will help you get there.